I also cut the side setting triangles as well as the borders for my Take 5 Crosses the line. I labeled my blocks and stacked them for sewing. I'll keep them and finish up the top at my upcoming retreat on July 20. In the mean time, I still have tops that need quilting and I also have a Paint Chip Challenge to start on. It's due in August, so I'm even farther behind on it. I know. Why have I been working on the quilt that is due in November if I have on that is due in August? Well, it's mostly because I have not actually decided on which pattern I'll use for this challenge. One day soon, I'll just have to pick something and get started. After all, I was the one who got talked into leading this challenge. The least I can do is have an entry in the thing.

1 comment:
I am also as far behind as you, or maybe even farther. We need a retreat to get caught up with all this stuff.
glen
Post a Comment